1.Insulating glass line with high automatic level is fully controlled by PLC system,the operation is easy and humanized.
2. Touch screen operation interface.It is easy to transfer between automation and hand-operation.
3. Self diagnosis system brings much high convenience to the user.
4. Automatically distinguish the film of LOW-E and coated glass.
5. The washing part is completely made of stainless steel, tempered glass door makes the operation inside clearly monitored. Signal switch on the top of the door avoid possible injure to the operator.
6. Energy saving and interrupted system for the washing machine.
7.Unique water nozzle design makes the maintenance easy and fast.
8.Heating system for the water and blowing air. Start it when the ambient temperature no more than 7 degree.
9.Automatic control 6 pcs brushes for Glass.
10.There is special system for Producing triple insulating glass.
11. Having system for wrong operation and automatically wait the second glass following.
12. Automatic assembly inside the press machine.
13.High class casting and processing of spare parts assure good stability of the line.
14.The key connections use expanded joint in stead of common union.This guarantee high adjustment precision and conveying reliability.
Max working size | 2000*3000mm |
Min working size | 500*300mm |
Single Glass Thickness | 3-25mm |
Max IGU thickness | 50mm |
Washing speed | 0-8m/min |
Conveyor speed | 45m/min |
Cycle | 30-40 seconds |
Air knife(blower) | 2 pcs |
Brush | 6 brushes( 2 brushes for LOW-E) |
Brush Diameter | Rough: 0.1mm, Fine: 0.06mm |
Electricity power | 3P 380V 50HZ /Optional |
Power | 24.71kw |
Dimension | 17.9*1.4*3m |
Weight | 3500kg |
Water | 0.5 ton per day |
Air Exhaust volume | 0.6m3/min |
Air pressure | 0.7Mpa |
1.Question:Are you manufacture?
Answer: Yes,we are professional manufacture which have more than 5 workshops.
2.Question: How about the service ?
Answer:
(1) Reply it within 12 hours if it from Ali-trademanager or email .
(2) Deliver max within 15 days.
(3) 24 hours for after -sale service.
(4) More than 12 years experience in this kind machine field.
(5) Fluent English ,communication barrier free.
3.Question:What's the guarantee ?
Answer:
(1) Our guarantee is 12 months.
(2) 24 hour's technical support by email or calling.
(3) English manual and video tutorial.
(4) 2 years quality guaranty for the machine (excluding the consumables).
(5) We will provide the consumable parts at an agency price.
(6) 24 hours on line service each day, free technical support.
4. Question: Do you provide equipment operation training?
Answer: Yes. We can send professional engineers to the working site for equipment installation, adjustment, and operation training. All of our engineers have passport.
5.Question:if our price is higher than another company or factories ?
Answer: Please check the different of the machine parts ,service and guarantee,especially the machine inner electric parts, sometimes, if machines have breakdown, the most reason is the machine inner electric parts problem, but we use the famous and reliable parts for the machines inside.
6.Question:How long is the delivery time ?
Answer: For standard machines, it would be 3-15 days; For non-standard machines and customized machines according to clients specific requirements, it would be 15 to 30 days.
7.Question: What is the payment ?
Answer: Any payment method you want,such as L/C,T/T,D/P,West-union and so on.