Customization: | Available |
---|---|
Certification: | CE, ISO |
Control System: | Automatic |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Automatic Desiccant Filler is used to input the desiccant into the aluminium spacer. The whole work procedure is controlled by PLC. The pouring is achieved under closed condition in order to avoid humidity and dust. It features simple structure and easy operation. Put the aluminium spacer into the bottler for several seconds. It is excellent equipment in producing Double Glazing Glass with aluminium spacer.
Desiccant | ф0.4~0.8mm |
Alu spacer thickness | 6.5mm |
Alu spacer width | < 25mm |
Spacer dimensions | 1800×2500mm |
Power | 380v/220v 50hz |
Min.Spacer dimensions | 200×200mm |
Max.Ai source pressure | 0.6~0.7MPa |
Overall dimension | 1000*1000*3100 |
1.Question:Are you manufacture?
Answer: Yes,we are professional manufacture which have more than 5 workshops.
2.Question: How about the service ?
Answer:
(1) Reply it within 12 hours if it from Ali-trademanager or email .
(2) Deliver max within 15 days.
(3) 24 hours for after -sale service.
(4) More than 12 years experience in this kind machine field.
(5) Fluent English ,communication barrier free.
3.Question:What's the guarantee ?
Answer:
(1) Our guarantee is 12 months.
(2) 24 hour's technical support by email or calling.
(3) English manual and video tutorial.
(4) 2 years quality guaranty for the machine (excluding the consumables).
(5) We will provide the consumable parts at an agency price.
(6) 24 hours on line service each day, free technical support.
4. Question: Do you provide equipment operation training?
Answer: Yes. We can send professional engineers to the working site for equipment installation, adjustment, and operation training. All of our engineers have passport.
5.Question:if our price is higher than another company or factories ?
Answer: Please check the different of the machine parts ,service and guarantee,especially the machine inner electric parts, sometimes, if machines have breakdown, the most reason is the machine inner electric parts problem, but we use the famous and reliable parts for the machines inside.
6.Question:How long is the delivery time ?
Answer: For standard machines, it would be 3-15 days; For non-standard machines and customized machines according to clients specific requirements, it would be 15 to 30 days.
7.Question: What is the payment ?
Answer: Any payment method you want,such as L/C,T/T,D/P,West-union and so on.