Customization: | Available |
---|---|
After-sales Service: | on Line Support |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1.Welding and cleaning(overlap/seam) at the same time, make the top and bottom smooth.
2.Both workable for white PVC/UPVC profile and colorful PVC/UPVC profile
3.High precision linear bearing guide, performance stable and accurate.
4.Individual pressure adjustable equipment(cylinder) for front and back clamping plates, the pressure of each plate can be adjusted independently.
5.Preheat system greatly reduces the internal stress, make welding much more strength.
6.The alarm system, ensure the machine can only start working on condition that everything is right, such as right air pressure. A constant temperature system, ensure high-quality welding performance
Model number | WFH-1A |
Power supply | 220V 50Hz or optional |
Welding seam | 0.2mm |
Input power | 1.5kw |
Welding length | 420~3500mm |
Welding profile height | 10~120mm |
Welding profile width | ≤120mm |
Welding mullion width | ≤110mm |
Air consumption | 180L/min |
Operation air pressure | 0.6 ~ 0.8Mpa |
Contour dimension(L*W*H) | 800*1200*1800mm |
Temperature | -5ºC~+40ºC |
Machine weight | 360kg |
Working capacity | 80-90pcs of window frame per day(8 hours) |
Q1:Are you a manufacture?
Answer: Yes, we are professional manufacture which has more than 5 workshops.
Q2: How about the service?
Answer:
1). reply it at once if from Ali-trade manager if by email, it reply it within 12 hour
2). deliver max. days within 15 days
3). 24 hours for after-sale service
4). more than 12 years experience in this kind of machine field
5). fluent English, communication barrier-free
Q3:What s the guarantee?
Answer:
1). Our guarantee for 18 months.
2). 24 hour's technical support by email or calling
3). English manual and video tutorial
4). 2 years quality guaranty for the machine (excluding the consumables)
5). We will provide the consumable parts at an agency price
6). 24 hours of online service each day, free technical support.
Q4: Do you provide equipment operation training?
Answer: Yes. We can send professional engineers to the working site for equipment installation, adjustment, and operation training. All of our engineers have passports.
Q5:if our price is higher than other companies or factories?
Answer: please check, what is the difference of the machine parts, service and guarantee, especially the machine inner electric parts, sometimes, if machines have a breakdown, the most reason is the machine inner electric parts the problem, but we use the famous and reliable parts for the machines inside.
Q6:How long is the delivery time?
Answer: For standard machines, it would be 3-15 days; For non-standard machines and customized machines according to the client's specific requirements, it would be 15 to 30 days.
Q7: What is the payment?
Answer: Any payment method you want, such as L/C, T/T, D/P, West union, and so on.